{"id":9064,"date":"2026-11-13T16:23:03","date_gmt":"2026-11-13T08:23:03","guid":{"rendered":"https:\/\/xzfastener.com\/?p=9064"},"modified":"2026-11-13T16:23:06","modified_gmt":"2026-11-13T08:23:06","slug":"fastener-substitution-deviation-approval","status":"publish","type":"post","link":"https:\/\/xzfastener.com\/fr\/fastener-substitution-deviation-approval\/","title":{"rendered":"Fastener Substitution and Deviation Approval Records"},"content":{"rendered":"<style>.xz-ops-guide{max-width:900px;width:100%;margin:0 auto;line-height:1.8;color:#253747;overflow-wrap:anywhere}.xz-ops-guide h2{font-size:26px;line-height:1.4;margin:30px 0 14px}.xz-ops-guide p{margin:0 0 18px}.xz-ops-guide li{margin:8px 0}.xz-ops-guide a{text-decoration:underline}@media(max-width:767px){.xz-ops-guide h2{font-size:22px}.xz-ops-guide ul{padding-left:22px}}<\/style><div class=\"xz-ops-guide\"><p>A supplier may propose a different fastener when the specified item has a long lead time or a difficult manufacturing requirement. Purchasing needs a record that makes the proposal reviewable and preserves the original requirement. A controlled deviation log helps the team reach a decision without allowing an informal email to become an unintended permanent change.<\/p><h2>Describe the requested item and offered alternative<\/h2><p>Record the buyer item code and approved drawing or specification revision first. Describe the offered item in a separate field and list every known difference. Material, condition, property class, dimensions, thread, finish, marking and document coverage may all matter. Ask the proposer to identify uncertain points instead of leaving the reviewer to infer them from a catalogue.<\/p><h2>Attach evidence for the affected features<\/h2><p>Provide the relevant drawing, dimensional comparison and available material or test records. Identify which evidence relates to stock already made and which relies on planned manufacturing. Where assembly performance requires engineering review, route the proposal to the designated authority. A price or delivery advantage alone cannot establish approval for the application.<\/p><h2>Limit the decision to its agreed scope<\/h2><p>The decision record should identify the approving authority, date, affected order lines, quantity, lots and intended application. State whether the decision covers this supply only or is linked to a formally revised requirement. Include conditions such as additional inspection or separate identification. Send the supplier the complete approved decision before authorizing substitution in the order.<\/p><h2>Carry the decision into packing and future orders<\/h2><p>Update the picking and inspection records with the approved deviation reference. Keep the original item code and the alternative description connected in the delivery documents. At the next reorder, review the normal requirement again and check whether the earlier exception still applies. This avoids a temporary solution becoming the default because an old invoice was copied.<\/p><h2>Prepare your enquiry<\/h2><p>Send your fastener schedule, approved grades, dimensions, quantities, destination and required date to <a href=\"https:\/\/xzfastener.com\/fr\/home\/contact-us\/\">XZ Fastener<\/a>. Include the records and approval arrangements discussed above. Material inspection reports, dimensional reports, batch traceability and drawing-based customization can be reviewed with your enquiry. State any EN 10204 3.1\/3.2 or third-party inspection requirement so its scope, issuing arrangements, price and timing can be confirmed before ordering.<\/p><p>Continue with <a href=\"https:\/\/xzfastener.com\/fr\/fastener-drawing-revision-after-quotation\/\">drawing revision changes after quotation<\/a> et le <a href=\"https:\/\/xzfastener.com\/fr\/project-fastener-order-control-records\/\">project order control record guide<\/a>.<\/p><\/div>","protected":false},"excerpt":{"rendered":"<p>A supplier may propose a different fastener when the specified item has a long lead time or a difficult manufacturing requirement. Purchasing needs a record that makes the proposal reviewable and preserves the original requirement. A controlled deviation log helps the team reach a decision without allowing an informal email to become an unintended permanent [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[479],"tags":[],"class_list":["post-9064","post","type-post","status-publish","format-standard","hentry","category-fastener-knowledge-library"],"acf":[],"_links":{"self":[{"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/posts\/9064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/comments?post=9064"}],"version-history":[{"count":1,"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/posts\/9064\/revisions"}],"predecessor-version":[{"id":9065,"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/posts\/9064\/revisions\/9065"}],"wp:attachment":[{"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/media?parent=9064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/categories?post=9064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/xzfastener.com\/fr\/wp-json\/wp\/v2\/tags?post=9064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}