XZ INSIGHTS

Industrial Fastening Knowledge · Industry Trends · Technical Insights

Units and Decimal Marks in Fastener Reports

Facebook
X
LinkedIn
Reddit
WhatsApp
Email

Table of Contents

An inspection file may pass between a supplier, an EPC contractor and a warehouse using different spreadsheet settings. A decimal comma can be interpreted as a field separator, and a column of numbers without units can become ambiguous. Agree how results will be written and imported before the report template is approved.

Put units beside the measurement

Show the unit for each dimensional field or for a clearly defined group of columns. Keep the drawing's governing unit system visible. If a translated or converted value is supplied for convenience, identify the original value and the conversion basis. Do not silently replace the drawing dimension with a rounded conversion or infer tolerances from the number of decimal places in a spreadsheet.

Agree the decimal convention

Both the point and comma are used as decimal markers in international SI practice. Choose a consistent convention for the agreed report and confirm that the recipient's software reads it correctly. Specify the CSV delimiter separately from the decimal marker. A PDF may display a value correctly even when a copied spreadsheet cell is interpreted differently.

Run a small import check

Use a short sample file containing the expected units, decimal format, signs and blank-field conventions. Ask document control or quality staff to open it with the software used for the actual review. Compare the displayed values with the controlled source and check the exported result again after any automated processing.

  • Drawing number, revision and governing units.
  • Characteristic or balloon reference.
  • Requirement and its acceptance reference.
  • Reported value and explicit unit.
  • Decimal marker and file delimiter for data exchange.
  • Handling of missing, not measured or not applicable results.

Keep transcription separate from acceptance

Changing the display format does not change a tolerance or make a part acceptable. Have the authorised reviewer resolve any uncertainty about requirements, rounding or decision rules. Retain the original issued report when creating a working spreadsheet and record who checked the transcription. For multilingual purchasing teams, translate field names while preserving the numbers, units and characteristic references exactly.

Discuss the order requirements

Send your product specification or drawing, quantity and destination to XZ Fastener. We can review custom supply, material inspection reports, dimensional reports and batch traceability with your enquiry. For EN 10204 3.1/3.2 or third-party inspection, confirm the required scope, issuing arrangements and buyer approval before ordering.

Use our project fastener order control records to connect this review to the wider purchase file.

Search articles
Subscribe to technical news

Industrial Fastening Knowledge · Industry Trends · Technical Insights

Quickly Contact a Business Expert

XZ Sales Engineer

Bulk fastener quotations · MOQ 1,000 pieces

Tell us your fastener requirements. Our sales team will prepare your quotation.

Lead time: 3 days. Custom packaging available. Shipping time and order details are confirmed in your quotation.

Optional: attach drawings, photos or a specification list. Accepted: PDF, JPG, PNG, Word, Excel, XML and TXT.

Thank you for visiting!

Kindly share your inquiry to sales@xzfastener.com