APERÇUS XZ

Connaissances en matière de fixation industrielle · Tendances de l'industrie · Informations techniques

Stainless Fastener Magnetic Permeability: RFQ Requirements

Facebook
X
LinkedIn
Reddit
WhatsApp
Courriel

Table of Contents

A hand magnet can raise a useful receiving question, but it is a poor substitute for an agreed magnetic requirement. For stainless screws, studs and nuts used near sensitive equipment, define what the finished component must demonstrate before asking suppliers to quote.

Separate alloy identification from magnetic acceptance

Austenitic stainless steels can develop a magnetic response following cold work. Duplex stainless steels also have a magnetic response. Neither a visible attraction nor its absence is a complete material identification result. Keep the specified alloy, mechanical condition and magnetic acceptance as separate order requirements; do not reject a batch solely because a workshop magnet behaves differently from an earlier delivery.

Ask engineering for a measurable requirement

Replace an undefined “non-magnetic” note with the project-approved property, limit, test method and measurement conditions. Relative permeability is one possible specified property, but the responsible engineer must select the limit and the applicable method. Do not copy a limit from an unrelated equipment tender. Confirm whether the requirement concerns the whole part, a particular location or the assembly after processing.

Test the condition that will be supplied

A raw-material record describes the material when tested. It does not automatically describe a cold-formed head, rolled thread or finished component. Ask the inspection provider which locations can be measured on the actual geometry and how part size affects the measurement. Identify the manufacturing stage and any operations that follow testing. If the requested finished-part test is impractical, obtain an approved alternative before manufacture.

Keep the report linked to the delivery

Request the part number, drawing revision, material heat, manufacturing lot, sample identification, method, equipment reference, conditions and results in the agreed report. A simple pass statement is difficult to compare when the receiving team uses another method. State who reviews discrepancies and whether parts must remain segregated pending a decision. Preserve the original material evidence alongside the magnetic record.

Prepare the enquiry

Include the equipment requirement and identify which features are accessible to the test instrument. Ask for a separate price and feasibility statement for finished-part verification; a stainless grade designation alone is not a promise of a particular permeability.

Send the drawing revision, material specification, quantities and destination to XZ Fastener for a quotation review. Identify any material inspection report, dimensional report, batch traceability, EN 10204 3.1/3.2 or third-party report required. The applicable scope, issuing parties and approval requirements need agreement before the order.

Related purchasing guidance: What a PMI result can confirm.

Rechercher des articles
Abonnez-vous aux actualités techniques

Connaissances en matière de fixation industrielle · Tendances de l'industrie · Informations techniques

Contactez rapidement un expert métier

XZ Ingénieur commercial

Bulk fastener quotations · MOQ 1,000 pieces

Tell us your fastener requirements. Our sales team will prepare your quotation.

Lead time: 3 days. Custom packaging available. Shipping time and order details are confirmed in your quotation.

Optional: attach drawings, photos or a specification list. Accepted: PDF, JPG, PNG, Word, Excel, XML and TXT.

Merci de votre visite !

Veuillez partager votre demande à sales@xzfastener.com