XZ INFORMACIONES

Conocimiento de fijación industrial · Tendencias de la industria · Conocimientos técnicos

Documentos CE y EN para envíos de sujetadores estructurales

facebook
x
LinkedIn
Reddit
WhatsApp
Correo electrónico

Table of Contents

Structural fastener shipments for European projects need more than invoice and packing list. If the bolts are used in regulated structural connections, buyers may also need CE-related documents, EN standard compliance records, and traceability files.

This is where many shipment delays start. The goods are finished, but the project inspector asks for a Declaration of Performance, CE label, EN 15048 or EN 14399 reference, or batch traceability record that was never confirmed in the RFQ.

Why CE and EN Documents Matter

CE marking is linked to declared performance under the applicable European construction product rules. For structural fasteners, the project specification usually defines whether EN 15048 or EN 14399 applies.

A general bolt certificate is not always enough.

Compradores abasteciéndose sujetadores de alta resistencia should confirm document requirements before production, not after packing.

EN 15048 vs EN 14399 Documents

EstándarTipo de sujetadorKey Shipment Documents
EN 15048Conjuntos de pernos estructurales no precargadosDoP, CE label, SB marking, assembly traceability
EN 14399High-strength structural bolting assemblies for preloadingDoP, CE label, HV/HR system documents, preload-related assembly records
EN 1090 project useSteel structure executionProject-specific inspection and installation requirements
Custom structural partsDrawing-based itemsDrawing inspection, material records, approval files

Do not substitute one EN standard for another unless the project engineer approves it in writing.

Core Documents Buyers Should Request

Commercial and Shipping Files

Every shipment should include:

  • Factura Comercial
  • Lista de embalaje
  • Bill of Lading or Air Waybill
  • Certificate of Origin if required
  • Contrato de venta o PI
  • Insurance document if applicable

For mixed shipments containing bolts, nuts, washers, anchors, or screws, the packing list must match carton labels. Buyers can review the full productos de fijación range when planning combined shipments.

Technical and Compliance Files

For structural fasteners, request:

DocumentoPropósito
Declaration of PerformanceSupports CE-related performance declaration
CE label or packaging markConfirms product identification for project review
Certificado de prueba de materialesConfirms material grade and heat number
Informe de prueba mecánicaVerifies grade, tensile, hardness, or proof load
Informe de recubrimientoConfirms finish, thickness, and corrosion requirement
Assembly traceabilityLinks bolt, nut, washer, lot, and packaging
Certificado de conformidadConfirms order and standard compliance

Para sujetadores estándar, document needs may be lighter. For structural assemblies, they are usually stricter.

Common Mistakes Before Shipment

Buyers should avoid these problems:

  • Asking only for “MTC” when DoP or CE documents are required.
  • Mixing bolts and nuts from different lots without traceability.
  • Using EN 15048 documents for EN 14399 projects.
  • Ignoring CE label requirements on packaging.
  • Confirming coating after production is complete.
  • Failing to match carton marks with inspection reports.

For coated structural fasteners, review varios sujetadores recubiertos and confirm coating reports before loading.

RFQ Checklist for CE and EN Shipments

Antes de realizar un pedido, especifique:

  1. Required EN standard
  2. Bolt, nut, and washer assembly details
  3. CE marking and DoP requirement
  4. Material and mechanical test reports
  5. Coating and corrosion test requirements
  6. Batch number and traceability format
  7. Packaging label requirements
  8. Final document approval before shipment

For special dimensions or project-specific assemblies, use sujetadores personalizados no estándar and confirm all compliance documents before production.

Consejo final

For European structural fastener shipments, documents are part of the product. A correct shipment should match the EN standard, CE-related files, test reports, batch labels, and packing list.

Confirm these details early. It prevents customs delays, site rejection, and last-minute document disputes.

Buscar artículos
Suscríbete a noticias técnicas

Conocimiento de fijación industrial · Tendencias de la industria · Conocimientos técnicos

Póngase en contacto rápidamente con un experto en negocios

XZ Ingeniero de ventas

Bulk fastener quotations · MOQ 1,000 pieces

Tell us your fastener requirements. Our sales team will prepare your quotation.

Lead time: 3 days. Custom packaging available. Shipping time and order details are confirmed in your quotation.

Optional: attach drawings, photos or a specification list. Accepted: PDF, JPG, PNG, Word, Excel, XML and TXT.

¡Gracias por visitarnos!

Por favor comparta su consulta con sales@xzfastener.com